In May 2021, Cyclone Tauktae struck the coastal areas of Gujarat with unprecedented destructive force, generating wind speeds of up to 220 km/h. The Herald Infratech solar facility, a 1 MW installation comprising photovoltaic panels and associated infrastructure, bore the brunt of this natural disaster. The cyclone’s impact was catastrophic, with nearly 80% of the entire plant suffering extensive damage.
Our restoration project presented several critical challenges that required immediate and comprehensive solutions
Cyclone Tauktae caused widespread destruction throughout the solar installation, affecting a substantial portion of the solar panels and associated electrical equipment. The scale of damage was extensive, requiring systematic assessment and replacement strategies from our team.
Our client faced significant pressure to restore the plant to operational status quickly to minimize ongoing financial losses from the non-productive asset. We understood that time was critical in preventing extended revenue loss and maintaining business continuity.
Managing the insurance claim process presented its own challenges for us, requiring coordination with insurance representatives to ensure seamless processing and secure necessary funding for the comprehensive restoration work.
Our systematic approach to the restoration project involved multiple coordinated phases
Our technical team immediately deployed to conduct a comprehensive assessment of the cyclone damage. This involved identifying affected components, evaluating salvageable elements, and developing a detailed restoration plan based on actual site conditions.
Leveraging our technical expertise, we collaborated closely with the insurance company to expedite the claim process. This collaboration was crucial in securing the necessary funds for the refurbishment while ensuring compliance with insurance requirements.
Our restoration work involved complete refurbishment of the solar installation, including:
Replacement of damaged photovoltaic panels
Installation of new inverters and electrical components
Reconstruction of supporting infrastructure
Upgrade of critical system components
Beyond mere restoration, our project incorporated design modifications and structural reinforcements to improve the plant’s ability to withstand future extreme weather events, ensuring long-term operational reliability.
The Herald Infratech refurbishment project delivered exceptional results across multiple performance metrics
Despite the extensive damage requiring comprehensive reconstruction, we successfully restored the solar plant to full operational capacity within the agreed timeframe, demonstrating our effective project management and execution capabilities.
The refurbished solar facility achieved improved performance metrics compared to pre-cyclone operations, generating power at an even more efficient rate than before the natural disaster. This enhancement represents added value beyond simple restoration that we delivered to our client.
Our collaboration with the insurance company proved highly effective, ensuring a smooth claims process that covered the refurbishment costs and minimized the financial impact on Herald Infratech.
Most notably, we completed the entire refurbishment project at a remarkable 30% cost reduction compared to industry competitors, demonstrating both our technical efficiency and cost management excellence.
This case study illustrates our capabilities at Benchmark in emergency solar infrastructure recovery, insurance coordination, and performance enhancement. The successful restoration of the Herald Infratech plant following such severe natural disaster damage demonstrates our technical expertise in complex refurbishment projects while delivering superior cost efficiency and enhanced performance outcomes.
Our commitment to excellence and client satisfaction enabled us to not only restore the facility but enhance its performance beyond original specifications, establishing a new benchmark for disaster recovery projects in the renewable energy sector.